    TECHNICAL Q&A

    /
     
Question 1 Which pilling technique is best for a power plant foundation? -


Our engineer’s answer:

It depends on many factors suchas soil conditions, loads from plant structure or neighboring environment. Basedon our experiences, we recommend Hydraulic Jack-in Piling technique for ourseveral plant construction sites instead of conven...

Question 2 How to investigate the cause of high temperature at pump equipment in a power plant? -

Our engineer’s answer:

We can give an example from one of our case studies. We found remarkably high temperature and overflow of grease from grease fitting at Steam Condenser Vacuum pump. Our investigation is to firstly measure bearing temperature with Thermal I...

Question 3 What items are needed to check for an instrument devices installation? -

Our engineer’s answer:

  • Check instrument calibration and documentation before installation.
  • Check instrument mounted as per the hookup drawing.
  • Check the instrument as per P&ID drawing.
  • Check for the Instrument securely insta...
     
  • ‹
  • |